Wind Energy Program


Production of energy through wind
The minimum wind speed needed to run these windmills is 5-7 m / s, while Serbia has the power of wind during the years from 1500 to 1800 h only which is less than the total capacity hours godišnje.Iz this reason the production of energy through windmills unprofitable. Because the wind exceeds the latest technology called levitaciona or magnetic technologies.



To start the wind made in this technology requires a minimum wind speed of only 1.5 m / s, and Serbia has the resources during the year with around 4,500 working hours a yield of over 50%. Repayment of this investment is 6-8 years so that this investment is very profitable, that is. Production of electricity through these wind turbines is very profitable as opposed to the application of wind technology here in Serbia.


A large energy potential of wind rose from Carpathians
The so-called wind rose covers the whole Vojvodina, Serbia and the eastern part of Sumadija.
Implementation of the project with the wind fields based on the most advanced magnetic technology - of company Grand Energy Plant of wind energy from Serbia brought half the electricity that brings us the Serbian part of the hydroelectric Iron Gate, which was really great upeh and profitable investment.
Wind generators of
magnetic technology
These magnetic generarori the latest technology because they can use the wind speed from 1.5 to 40 m/s, which is over 50% of the time.

More details >>>
Energy from biomass
Using this energy can only be accepted if the biomass is produced on degraded and non-agricultural lands.

More details >>>